Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 9, 2019, 10:03 AM
  • 02 1120_02 1119 _04092019_032517.mp4

Date
04/09/2019
W/O
761209
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00351
PipeID
P02899
Time
3:03 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6516
Sewer Name
02 GARFIELD AVENUE EXTENSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
14
Purpose
Routine Assessment
Project
RFIR_WO_761209_TV02318_APR2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 1120
Downstream MH
02 1119
Dir. of Survey
Downstream
Length Surveyed
292.9 ft.
Total Length
292.9 ft.
Structural Index
4
Structural Quick
4J31
Structural Rating
219
O&M Index
2
O&M Quick
2K00
O&M Rating
116
Overall Index
3
Overall Quick
Overall Rating
335
Pipe schematic from manhole 02 1120 to 02 1119
MH: 02 1120MH: 02 1119downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 11200 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 45 %of cross sectional area0.5 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start10.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"11.7 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES13.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"20 ft. MGO - General Observation - MAG COAT THROUGHOUT22.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start61.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"64.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"111.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"114.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"162.6 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"165.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"168.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"216 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"219.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"264 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 6"267.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"270.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"290 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish292 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish292.9 ft. AMH - Downstream Manhole, Survey Ends - 02 1119

Observation photos (2)

  • Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    11.7 ft. - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    22.4 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (24)

DistanceCodeObservation
264TB
61.2TFA
216TFC
22.4FM
13.4TFC
111.8TFC
168.8TF
64.5TFA
165.4TFC
0AMH02 1120
0MWL
292.9AMH02 1119
10.2TFA
267.4TFA
270.3TFC
0.5DAGS
162.6TBA
219.3TFC
11.7CM
292DAGS
20MGOMAG COAT THROUGHOUT
0MWM
114.9TFC
290FM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-04-09T03:03:58-07:00
documentation
PROPIPE
is_lateral_inspection
false