Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 4, 2019, 09:53 AM
  • 02 1152_02 1151_04042019_031557.mp4

Date
04/04/2019
W/O
761209
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00351
PipeID
P02936
Time
2:53 AM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6512
Sewer Name
02 GARFIELD AVENUE EXTENSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_761209_TV02318_APR2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
02 1151
Downstream MH
02 1152
Dir. of Survey
Upstream
Length Surveyed
318 ft.
Total Length
318 ft.
Structural Index
4
Structural Quick
4300
Structural Rating
12
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
16
Pipe schematic from manhole 02 1151 to 02 1152
MH: 02 1151MH: 02 1152upstream0 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH0 ft. AMH - Upstream Manhole, Survey Ends - 02 11522.4 ft. FM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish2.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: YES8.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"42.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"91.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"141.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"193.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"198 ft. FM - Fracture Multiple, from 12 to 02 o'clock, within 8 inches of joint: YES246 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"296 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - LATERAL BROKEN315 ft. FM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start318 ft. AMH - Downstream Manhole, Survey Begins - 02 1151318 ft. MWL - Water Level, 10 %of cross sectional area318 ft. MWM - Water Mark, 30 %of cross sectional area

Observation photos (3)

  • Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - LATERAL BROKEN

    22 ft. - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - LATERAL BROKEN

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 04 o'clock,  , within 8 inches of joint: YES

    315.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 04 o'clock, , within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
0AMH02 1151
315.6FM
120FM
3FM
0MWL
315.6DAGS
309.2TFC
318MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
275.1TFC
318AMH02 1152
0MWM
226.2TFC
176.8TFC
22TFDLATERAL BROKEN
124.6TFC
72TFC

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-04-04T02:53:33-07:00
documentation
PROPIPE
is_lateral_inspection
false