Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 9, 2019, 06:22 AM
  • 02 1124_02 1123_04082019_234323.mp4

Date
04/08/2019
W/O
761209
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00351
PipeID
P02904
Time
11:22 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6516
Sewer Name
02 GARFIELD AVENUE EXTENSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
14
Purpose
Routine Assessment
Project
RFIR_WO_761209_TV02318_APR2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 1124
Downstream MH
02 1123
Dir. of Survey
Downstream
Length Surveyed
355.3 ft.
Total Length
355.3 ft.
Structural Index
4
Structural Quick
4H11
Structural Rating
177
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
4
Overall Quick
Overall Rating
183
Pipe schematic from manhole 02 1124 to 02 1123
MH: 02 1124MH: 02 1123downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK CAPPED0 ft. MWL - Water Level, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 11241 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.8 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start29.1 ft. SRI - Surface Roughness Increased, from 09 to 03 o'clock, within 8 inches of joint: YES139 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start218.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"268.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"320.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"351.9 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish354 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish355 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish355.3 ft. AMH - Downstream Manhole, Survey Ends - 02 1123

Observation photos (1)

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
139FM
351.9FM
320.1TFC
29.1SRI
2.8FM
355.3AMH02 1123
0MWM
0MGOCONNECTION AT MH 9 O'CLOCK CAPPED
354DAGS
268.8TFC
1DAGS
355FM
0MWL
0AMH02 1124
218.2TFC

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-04-08T23:22:32-07:00
documentation
PROPIPE
is_lateral_inspection
false