Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 9, 2019, 05:59 AM
  • 02 1125_02 1124_04082019_232139.mp4

Date
04/08/2019
W/O
761209
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z00351
PipeID
P02905
Time
10:59 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6516
Sewer Name
02 GARFIELD AVENUE EXTENSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
14
Purpose
Routine Assessment
Project
RFIR_WO_761209_TV02318_APR2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 1125
Downstream MH
02 1124
Dir. of Survey
Downstream
Length Surveyed
272.1 ft.
Total Length
272.1 ft.
Structural Index
4
Structural Quick
4F21
Structural Rating
134
O&M Index
2
O&M Quick
412J
O&M Rating
114
Overall Index
3
Overall Quick
Overall Rating
248
Pipe schematic from manhole 02 1125 to 02 1124
MH: 02 1125MH: 02 1124downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 11250 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 50 %of cross sectional area1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start5.4 ft. FM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start30.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"49.7 ft. TBI - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: YES, 6", 1"86.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"103.4 ft. FM - Cracik Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish105.6 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES108 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start268 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish272 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish272.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK272.1 ft. AMH - Downstream Manhole, Survey Ends - 02 1124

Observation photos (4)

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.4 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: YES, 6", 1"

    49.7 ft. - Tap Break-In Intruding, at 10 o'clock, -, -, within 8 inches of joint: YES, 6", 1"

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES

    105.6 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    108 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
30.7TFC
0AMH02 1125
0MWM
86.3TFC
108FM
272.1MGOCONNECTION AT MH 9 O'CLOCK
272.1AMH02 1124
272DAGS
268FM
105.6SSS
0MWL
49.7TBI
1DAGS
103.4FM
5.4FM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-04-08T22:59:28-07:00
documentation
PROPIPE
is_lateral_inspection
false