Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 10, 2019, 07:53 AM
  • 02 1164_02 1163_04102019_011137.mp4

Date
04/10/2019
W/O
761209
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00351
PipeID
P02948
Time
12:53 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5924
Sewer Name
02 GARFIELD AVENUE EXTENSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_761209_TV02318_APR2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
02 1163
Downstream MH
02 1164
Dir. of Survey
Upstream
Length Surveyed
233.4 ft.
Total Length
233.4 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2H00
O&M Rating
92
Overall Index
2
Overall Quick
Overall Rating
95
Pipe schematic from manhole 02 1163 to 02 1164
MH: 02 1163MH: 02 1164upstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK CAPPED0 ft. AMH - Upstream Manhole, Survey Ends - 02 11640.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish29.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"78.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"130.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"182.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"186.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start223.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"227.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"232.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start233.4 ft. AMH - Downstream Manhole, Survey Begins - 02 1163233.4 ft. MWL - Water Level, 10 %of cross sectional area233.4 ft. MWM - Water Mark, 40 %of cross sectional area

Observation photos (2)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    46.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - CONNECTION AT MH 9 O'CLOCK CAPPED

    233.4 ft. - General Observation - CONNECTION AT MH 9 O'CLOCK CAPPED

Observations (15)

DistanceCodeObservation
233.4MGOCONNECTION AT MH 9 O'CLOCK CAPPED
103.2TF
233DAGS
0AMH02 1163
203.7TF
10.2TB
0MWL
0MWM
233.4AMH02 1164
5.6TFC
51.3TFC
1DAGS
154.7TF
230.4CM
46.6CM

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-04-10T00:53:57-07:00
documentation
PRO PIPE
is_lateral_inspection
false