02 1594_02 1593_08072019_222002.mp4

0 ft. - Upstream Manhole, Survey Begins - 02 1594
4.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
4.5 ft. - Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES
62.5 ft. - Fracture Spiral, from 11 to 12 o'clock, within 8 inches of joint: YES
87 ft. - Fracture Spiral, from 12 to 01 o'clock, within 8 inches of joint: YES
105.3 ft. - Broken, from 10 to 12 o'clock, within 8 inches of joint: YES
111.4 ft. - Broken, from 10 to 02 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 168.7 | MGO | CONNECTION AT MH 3 OCLOCK CAPPED |
| 0 | MWL | — |
| 4.5 | DAGS | — |
| 111.4 | B | — |
| 66.4 | TB | — |
| 87 | FS | — |
| 4.5 | MGO | SPLASHING DUE TO TURBULENT FLOW |
| 0 | AMH | 02 1594 |
| 0.1 | DAE | — |
| 62.5 | FS | — |
| 0.1 | LD | — |
| 165.9 | DAGS | — |
| 4.5 | CS | — |
| 0 | MWM | — |
| 168.7 | AMH | 02 1593 |
| 168 | DAE | — |
| 143.4 | TFC | — |
| 105.3 | B | — |
| 29.8 | MWL | — |