Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 8, 2019, 07:08 AM
  • 02 2255_02 1582_08082019_002952.mp4

Date
08/08/2019
W/O
782707
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00231
PipeID
P04034
Time
12:08 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6737
Sewer Name
02 ARIZONA AVENUE TRUNK, SECTION 2
City
LOS ANGELES
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_782707_TV02376_AUG2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
02 2255
Downstream MH
02 1582
Dir. of Survey
Downstream
Length Surveyed
313.4 ft.
Total Length
313.4 ft.
Structural Index
3
Structural Quick
3K27
Structural Rating
197
O&M Index
2
O&M Quick
2X1F
O&M Rating
283
Overall Index
2
Overall Quick
Overall Rating
480
Pipe schematic from manhole 02 2255 to 02 1582
MH: 02 2255MH: 02 1582downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 22550 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start4.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start7.6 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start17.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"33 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish93.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"120 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"168.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"183.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"184.5 ft. RFJ - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish219.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"254.4 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"312.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish312.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish313 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Finish313.4 ft. AMH - Downstream Manhole, Survey Ends - 02 1582

Observation photos (9)

  • Upstream Manhole, Survey Begins - 02 2255

    0 ft. - Upstream Manhole, Survey Begins - 02 2255

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock,  , within 8 inches of joint: YES, Start

    0.5 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    4.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.6 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    7.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    17.7 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    93.1 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"

  • Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"

    120 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"

Observations (21)

DistanceCodeObservation
312.5DAGS
312.5CM
93.1TF
184.5RFJ
313DAE
168.1TF
313.4AMH02 1582
0.5DAE
5.2SSS
0AMH02 2255
7.6RFJ
183.1TB
120TF
4.5DAGS
219.3TF
33SSS
7.6CM
254.4TB
17.7TF
0MWL
0MWM

Properties (6)

additional_info
SC378236
custom_field_two
3
customer
LACSD
datetime
2019-08-08T00:08:28-07:00
documentation
PROPIPE
is_lateral_inspection
false