02 2255_02 1582_08082019_002952.mp4

0 ft. - Upstream Manhole, Survey Begins - 02 2255

0.5 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start
4.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

5.2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

7.6 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

7.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

17.7 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"

93.1 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"

120 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"
| Distance | Code | Observation |
|---|---|---|
| 312.5 | DAGS | — |
| 312.5 | CM | — |
| 93.1 | TF | — |
| 184.5 | RFJ | — |
| 313 | DAE | — |
| 168.1 | TF | — |
| 313.4 | AMH | 02 1582 |
| 0.5 | DAE | — |
| 5.2 | SSS | — |
| 0 | AMH | 02 2255 |
| 7.6 | RFJ | — |
| 183.1 | TB | — |
| 120 | TF | — |
| 4.5 | DAGS | — |
| 219.3 | TF | — |
| 33 | SSS | — |
| 7.6 | CM | — |
| 254.4 | TB | — |
| 17.7 | TF | — |
| 0 | MWL | — |
| 0 | MWM | — |