B 0852_B 0572 _01082019_015413.mp4

0 ft. - Downstream Manhole, Survey Begins - B 0572
2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
2.1 ft. - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
13.5 ft. - Deposits Settled Fine, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
46.3 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
522.4 ft. - Material Change, Vitrified clay pipe
522.8 ft. - Alignment Right, 30 %
| Distance | Code | Observation |
|---|---|---|
| 13.5 | DSF | — |
| 522.4 | SCP | — |
| 522.4 | SRI | — |
| 2.1 | SCP | — |
| 522.8 | LR | — |
| 522.8 | AMH | B 0852 |
| 0 | MWL | — |
| 522.8 | DAGS | — |
| 0 | MGO | CONNECTIONS AT 3'0 AND 9'0 IN MH |
| 0 | MWM | — |
| 46.3 | SRI | — |
| 46.1 | DSF | — |
| 0 | AMH | B 0572 |
| 522.4 | MMC | — |
| 2 | DAGS | — |