Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 19, 2019, 08:54 AM
  • 03 0551_03 0055_08192019_021355.mp4

Date
08/19/2019
W/O
782302
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00366
PipeID
P05076
Time
1:54 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6865
Sewer Name
03 LOS COYOTES DIAGONAL TRUNK
City
LAKEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_782302_TV03159_AUG2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
03 0551
Downstream MH
03 0055
Dir. of Survey
Downstream
Length Surveyed
284.8 ft.
Total Length
284.8 ft.
Structural Index
4
Structural Quick
4H32
Structural Rating
186
O&M Index
2
O&M Quick
2V00
O&M Rating
226
Overall Index
3
Overall Quick
Overall Rating
412
Pipe schematic from manhole 03 0551 to 03 0055
MH: 03 0551MH: 03 0055downstream0 ft. AMH - Upstream Manhole, Survey Begins - 03 05510 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK2 ft. FM - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start18.3 ft. FM - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish22.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"29.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start66.7 ft. FM - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start95.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"100 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish276.5 ft. FM - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish282.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish284 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Finish284.8 ft. AMH - Downstream Manhole, Survey Ends - 03 0055

Observation photos (5)

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    29.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

    66.7 ft. - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
18.3FM
66.7FM
0AMH03 0551
2FM
100CM
2DAGS
29.8CM
95.7TFC
22.7TFC
282.2DAGS
0DAE
0MWM
284.8AMH03 0055
276.5FM
0MWL
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
284DAE

Properties (6)

additional_info
SC378335
custom_field_two
3
customer
LACSD
datetime
2019-08-19T01:54:55-07:00
documentation
PRO PIPE
is_lateral_inspection
false