02 1171_02 1170 _31072019_225643.mp4
2 ft. - Deposits Attached Grease, 10 %of cross sectional area, at 03 o'clock, , within 8 inches of joint: YES
7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
12.5 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start
16.8 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
54.6 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
68.1 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"
119.2 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
169.6 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
220.6 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"
268.5 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"
| Distance | Code | Observation |
|---|---|---|
| 301.1 | AMH | 02 1170 |
| 119.2 | TFC | — |
| 54.6 | DAGS | — |
| 68.1 | TFC | — |
| 268.5 | TF | — |
| 220.6 | TFC | — |
| 12.5 | FM | — |
| 299.9 | DAGS | — |
| 299.9 | FM | — |
| 169.6 | TFC | — |
| 0 | MWL | — |
| 16.8 | TFC | — |
| 0 | AMH | 02 1171 |
| 0 | MWM | — |
| 2 | DAGS | — |
| 7 | FM | — |