Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 8, 2019, 04:56 PM
  • H 0406_H 0405_1082019_105637.mp4

Date
10/08/2019
W/O
0792740
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z00177
PipeID
P10840
Time
9:56 AM
Certificate
U-115-06022628
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8097
Sewer Name
H JOINT OUTFALL H - UNIT 5A
City
WHITTIER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
02
Purpose
Capital Improvement Program Assesment
Project
20191008MI_JOINT_OUTFALL_H_UNIT_5A
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Upstream MH
H 0406
Downstream MH
H 0405
Dir. of Survey
Downstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
5
O&M Quick
5141
O&M Rating
9
Overall Index
4
Overall Quick
Overall Rating
19
Pipe schematic from manhole H 0406 to H 0405
MH: H 0406MH: H 0405downstream0 ft. MWL - Water Level, 100 %of cross sectional area0 ft. MWM - Water Mark, 100 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 10:40 AM2 ft. MSA - Survey Abandoned - VIEW OF THE DOWNLEG PIPE OF THE U/S SIPHON (NW)2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES2 ft. LD - Alignment Down, 45 %2 ft. MGP - General Photograph - EXPOSED REINFORCEMENT2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES

  • General Photograph - EXPOSED REINFORCEMENT

    2 ft. - General Photograph - EXPOSED REINFORCEMENT

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (9)

DistanceCodeObservation
2MSAVIEW OF THE DOWNLEG PIPE OF THE U/S SIPHON (NW)
2SSS
2SAP
2LD
0MWL
2MGPEXPOSED REINFORCEMENT
0MWM
0AMH10:40 AM
2SRV

Properties (7)

additional_info
LOOKING AT THE DOWNLEG PIPE OF THE U/S SIPHON (S/E)
custom_field_two
2
customer
LACSD
datetime
2019-10-08T09:56:57-07:00
documentation
IGNACIO, FRANKLIN, BRAR, SHADLER
is_lateral_inspection
false
year_laid
20051001