H 0404_H 0403A_1092019_110045.mp4
2 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 50% MAG
170.9 ft. - General Photograph
333.2 ft. - General Photograph
462.8 ft. - General Photograph
580.2 ft. - General Photograph
668.7 ft. - General Photograph
686.9 ft. - General Observation - Peeling & Flaking Throughout The Reach
| Distance | Code | Observation |
|---|---|---|
| 462.8 | MGP | — |
| 687 | MGO | GREASE THROUGHOUT THE REACH (5%) |
| 0 | AMH | 9:15 AM |
| 685.9 | DAR | — |
| 685.9 | SRC | — |
| 0 | MWL | — |
| 2 | SRC | — |
| 2 | SSS | — |
| 685.9 | SZ | 50% MAG |
| 2 | DAR | — |
| 685.9 | SSS | — |
| 685.9 | SAP | — |
| 580.2 | MGP | — |
| 668.7 | MGP | — |
| 2 | SAP | — |
| 686.9 | MGO | Peeling & Flaking Throughout The Reach |
| 693 | AMH | 11:37 AM |
| 170.9 | MGP | — |
| 0 | MWM | — |
| 2 | SZ | 50% MAG |
| 333.2 | MGP | — |