Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 9, 2019, 04:18 PM
  • H 0404_H 0403A_1092019_110045.mp4

Date
10/09/2019
W/O
0792740
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00177
PipeID
P10835
Time
9:18 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8098
Sewer Name
H JOINT OUTFALL H - UNIT 5A
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
02
Purpose
Capital Improvement Program Assesment
Project
20191007DF_JOINT_OUTFALL_H_UNIT_5A
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Upstream MH
H 0404
Downstream MH
H 0403A
Dir. of Survey
Downstream
Length Surveyed
693 ft.
Total Length
693 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole H 0404 to H 0403A
MH: H 0404MH: H 0403Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 9:15 AM0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 50% MAG170.9 ft. MGP - General Photograph333.2 ft. MGP - General Photograph462.8 ft. MGP - General Photograph580.2 ft. MGP - General Photograph668.7 ft. MGP - General Photograph685.9 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish685.9 ft. SRC - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish685.9 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 50% MAG685.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish685.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish686.9 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach687 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)693 ft. AMH - Downstream Manhole, Survey Ends - 11:37 AM

Observation photos (11)

  • Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Ragging, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 50% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 50% MAG

  • General Photograph

    170.9 ft. - General Photograph

  • General Photograph

    333.2 ft. - General Photograph

  • General Photograph

    462.8 ft. - General Photograph

  • General Photograph

    580.2 ft. - General Photograph

  • General Photograph

    668.7 ft. - General Photograph

  • General Observation - Peeling & Flaking Throughout The Reach

    686.9 ft. - General Observation - Peeling & Flaking Throughout The Reach

Observations (21)

DistanceCodeObservation
462.8MGP
687MGOGREASE THROUGHOUT THE REACH (5%)
0AMH9:15 AM
685.9DAR
685.9SRC
0MWL
2SRC
2SSS
685.9SZ50% MAG
2DAR
685.9SSS
685.9SAP
580.2MGP
668.7MGP
2SAP
686.9MGOPeeling & Flaking Throughout The Reach
693AMH11:37 AM
170.9MGP
0MWM
2SZ50% MAG
333.2MGP

Properties (6)

custom_field_three
REINFORCEMENT CORRODED/AGGREGATE PROJECTING
custom_field_two
3
customer
LACSD
datetime
2019-10-09T09:18:55-07:00
documentation
FRANKLIN, IGNACIO, RUVALCABA, SHADLER
is_lateral_inspection
false