C 0193_C 0192_942019_004728.mp4
8 ft. - General Observation - 22.50" RCP +PEP
45.2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: NO, Start
54.8 ft. - General Observation - PEP LINER GOOD COND
142 ft. - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Start - SLUDGE HARD POSSIBLE CONCRETE
149.7 ft. - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - POSSIBLE CONCRETE UNDER FLOW
156.8 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 11 to 04 o'clock, , within 8 inches of joint: YES
174.7 ft. - Downstream Manhole, Survey Ends - 1:25AM
| Distance | Code | Observation |
|---|---|---|
| 50.7 | DAGS | — |
| 0 | AMH | 12:35AM |
| 142 | DSZ | SLUDGE HARD POSSIBLE CONCRETE |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 156.8 | DAE | — |
| 8 | MGO | 22.50" RCP +PEP |
| 54.8 | MGO | PEP LINER GOOD COND |
| 142 | MWL | — |
| 0 | MWL | — |
| 174.1 | DSZ | SLUDGE ,POSSIBLE CONCRETE |
| 149.7 | DSZ | POSSIBLE CONCRETE UNDER FLOW |
| 43.1 | MWL | — |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 0 | MWM | — |
| 45.2 | DAGS | — |
| 35.3 | DSZ | SLUDGE |
| 174.7 | AMH | 1:25AM |
| 174.1 | DSZ | SLUDGE |
| 43.1 | DSZ | SLUDGE |
| 54.8 | MWM | — |
| 24.5 | MWM | — |
| 54.8 | DSZ | SLUDGE |
| 43.1 | MWM | — |
| 54.8 | MWL | — |
| 7.1 | DAGS | — |