Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 26, 2019, 08:03 AM
  • 32 1209_32 1208A_09262019_011132.mp4

Date
09/26/2019
W/O
782704
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00843
PipeID
P26559
Time
1:03 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7017
Sewer Name
32 SOLEDAD CANYON RELIEF TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
10
Purpose
Routine Assessment
Project
RFIR_WO_782704_TV32023_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
32 1209
Downstream MH
32 1208A
Dir. of Survey
Downstream
Length Surveyed
170.4 ft.
Total Length
170.4 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
165
O&M Index
2
O&M Quick
2F00
O&M Rating
66
Overall Index
2
Overall Quick
Overall Rating
231
Pipe schematic from manhole 32 1209 to 32 1208A
MH: 32 1209MH: 32 1208Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 12090 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING THROUGHOUT168.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish168.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish168.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish170.4 ft. AMH - Downstream Manhole, Survey Ends - 32 1208A170.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

Observations (12)

DistanceCodeObservation
0AMH32 1209
170.4AMH32 1208A
168.2DAGS
168.2SSS
170.4MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0MWL
2DAGS
168.2SAP
2SSS
2SAP
0MWM
2MGOMAG COATING THROUGHOUT

Properties (7)

additional_info
SC378633
custom_field_two
3
customer
LACSD
datetime
2019-09-26T01:03:57-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
26872