32 1297_32 1229_09102019_020245.mp4

0 ft. - Upstream Manhole, Survey Begins - 32 1297
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

14.1 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start
113.8 ft. - Water Level, Sag in pipe, 60 %of cross sectional area, Start
193.8 ft. - General Observation - RUN LIST STATES PIPE MATERIAL IS VCP. SECTION INFO CHANGED TO REFLECT ACTUAL PIPE MATERIAL.
404.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
404.7 ft. - Material Change, Reinforced concrete pipe
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 32 1297 |
| 14.1 | DAE | — |
| 2 | DAGS | — |
| 409 | DAE | — |
| 173.7 | MWLS | — |
| 0 | MWM | — |
| 0 | MWL | — |
| 409.9 | DAGS | — |
| 193.8 | MGO | RUN LIST STATES PIPE MATERIAL IS VCP. SECTION INFO CHANGED TO REFLECT ACTUAL PIPE MATERIAL. |
| 113.8 | MWLS | — |
| 409.9 | DAZ | — |
| 404.7 | SSS | — |
| 409.9 | SSS | — |
| 2 | DAZ | — |
| 404.7 | MMC | — |
| 411.2 | AMH | 32 1229 |