Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 23, 2019, 09:07 AM
  • 32 1202_32 1201 _09232019_022243.mp4

Date
09/23/2019
W/O
782704
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00843
PipeID
P19656
Time
2:07 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7007
Sewer Name
32 SOLEDAD CANYON RELIEF TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_782704_TV32023_AUG2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
32 1202
Downstream MH
32 1201
Dir. of Survey
Downstream
Length Surveyed
547.2 ft.
Total Length
547.2 ft.
Structural Index
3
Structural Quick
3U2U
Structural Rating
545
O&M Index
2
O&M Quick
2U00
O&M Rating
218
Overall Index
2
Overall Quick
Overall Rating
763
Pipe schematic from manhole 32 1202 to 32 1201
MH: 32 1202MH: 32 1201downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 12020 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.5 ft. MGO - General Observation - MAG COAT THROUGHOUT544.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish544.8 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish544.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish547.2 ft. AMH - Downstream Manhole, Survey Ends - 32 1201

Observation photos (3)

  • Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0MWL
2.5MGOMAG COAT THROUGHOUT
544.8SSS
0AMH32 1202
544.8DAGS
547.2AMH32 1201
0MWM
544.8SAP
2DAGS
2SAP
2SSS

Properties (7)