Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 13, 2019, 07:19 AM
  • 18 0825_18 0824 _08132019_003042.mp4

Date
08/13/2019
W/O
782250
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00707
PipeID
P14688
Time
12:19 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6778
Sewer Name
18 SO WHITTIER OUTFALL TR, SECT 5
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_782250_TV18119_AUG2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0825
Downstream MH
18 0824
Dir. of Survey
Downstream
Length Surveyed
127.5 ft.
Total Length
127.5 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2211
O&M Rating
5
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole 18 0825 to 18 0824
MH: 18 0825MH: 18 0824downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 08250 ft. VC - Vermin Cockroach0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start5.2 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start24.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"28.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"77.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"80.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"118.5 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 6"123.3 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish125.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Finish126.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish127.5 ft. AMH - Downstream Manhole, Survey Ends - 18 0824127.5 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 07 to 05 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    5.2 ft. - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
123.3CM
0AMH18 0825
127.5AMH18 0824
118.5TB
77.8TF
0VC
127.5MGOCONNECTION AT MH 9 O'CLOCK
5.2CM
125.3DAE
0MWM
0MGOCONNECTION AT MH 3 O'CLOCK
126.3DAGS
2DAE
24.9TFC
0MWL
28.1TFC
80.9TFC
2DAGS

Properties (6)

additional_info
SC378284
custom_field_two
3
customer
LACSD
datetime
2019-08-13T00:19:42-07:00
documentation
PRO PIPE
is_lateral_inspection
false