Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 22, 2019, 02:36 PM
  • 18 0816_18 0815 _08222019_080919.mp4

Date
08/22/2019
W/O
782250
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00707
PipeID
P14679
Time
7:36 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6791
Sewer Name
18 SO WHITTIER OUTFALL TR, SECT 5
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Routine Assessment
Project
RFIR_WO_782250_TV18119_AUG2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0816
Downstream MH
18 0815
Dir. of Survey
Downstream
Length Surveyed
209.6 ft.
Total Length
209.6 ft.
Structural Index
4
Structural Quick
4G31
Structural Rating
161
O&M Index
2
O&M Quick
2G11
O&M Rating
83
Overall Index
3
Overall Quick
Overall Rating
244
Pipe schematic from manhole 18 0816 to 18 0815
MH: 18 0816MH: 18 0815downstream0 ft. VC - Vermin Cockroach0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 08162.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start3 ft. FM - Fracture Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES10.9 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 6"14.4 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES17.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start54.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"107.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"189.4 ft. SSS - Surface Spalling, at 02 o'clock, within 8 inches of joint: YES205.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish205.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish209.1 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK209.6 ft. AMH - Downstream Manhole, Survey Ends - 18 0815

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES

    3 ft. - Fracture Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    14.4 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    17.4 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, at 02 o'clock, within 8 inches of joint: YES

    189.4 ft. - Surface Spalling, at 02 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
17.4FM
54.8TFC
14.4FL
209.6AMH18 0815
0VC
0MWM
205.3DAGS
10.9TFA
0MWL
0AMH18 0816
3FM
107.2TFC
189.4SSS
205.4FM
2.2DAGS
209.1MGOCONNECTION AT MH 3 OCLOCK

Properties (6)

additional_info
SC378297
custom_field_two
2
customer
LACSD
datetime
2019-08-22T07:36:00-07:00
documentation
PRO PIPE
is_lateral_inspection
false