Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 3, 2018, 07:04 AM
  • 21 1105_21 1104 _02012018_230440.mp4

Date
01/02/2018
W/O
679327
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00769
PipeID
P16215
Time
11:04 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5301
Sewer Name
21 GAREY AVENUE TRUNK
City
POMONA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
03
Purpose
Routine Assessment
Project
WO_679327_TV21012_JAN2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
21 1105
Downstream MH
21 1104
Dir. of Survey
Downstream
Length Surveyed
308 ft.
Total Length
308.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 21 1105 to 21 1104
MH: 21 1105MH: 21 1104downstream0 ft. AMH - Upstream Manhole, Survey Begins - 21 11050 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK308.1 ft. AMH - Downstream Manhole, Survey Ends - 21 1104308.1 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observations (6)

DistanceCodeObservation
0AMH21 1105
0MWL
308.1AMH21 1104
308.1MGOCONNECTION AT MH 3 O'CLOCK
0MWM
0MGOCONNECTION AT MH 9 O'CLOCK

Properties (6)

additional_info
SC346775
custom_field_two
4
customer
LACSD
datetime
2018-01-02T23:04:11-08:00
documentation
PROPIPE
is_lateral_inspection
false