Wastewater/Activity/PacpInspection/1.0Jan 3, 2018, 08:07 AM
  • 21 1102A_21 1102 _03012018_000737.mp4

Date
01/03/2018
W/O
679327
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00769
PipeID
P16212
Time
12:07 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5301
Sewer Name
21 GAREY AVENUE TRUNK
City
POMONA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
03
Purpose
Routine Assessment
Project
WO_679327_TV21012_JAN2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
21 1102A
Downstream MH
21 1102
Dir. of Survey
Downstream
Length Surveyed
134.1 ft.
Total Length
134.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 21 1102A to 21 1102
MH: 21 1102AMH: 21 1102downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 21 1102A0 ft. MWM - Water Mark, 15 %of cross sectional area23.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"74.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"126.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"134.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK134.1 ft. AMH - Downstream Manhole, Survey Ends - 21 1102

Observations (9)

DistanceCodeObservation
23.6TFC
0MGOCONNECTION AT MH 3 O'CLOCK
0MWL
134.1MGOCONNECTION AT MH 9 O'CLOCK
134.1AMH21 1102
0AMH21 1102A
126.3TFC
0MWM
74.9TFC

Properties (6)

additional_info
SC346775
custom_field_two
4
customer
LACSD
datetime
2018-01-03T00:07:06-08:00
documentation
PROPIPE
is_lateral_inspection
false