Wastewater/Activity/PacpInspection/1.0Oct 1, 2018, 04:30 PM
  • 2 DOWNEY-BELLFLOWER RELIE_A 0182_1012018_114639.mp4

Date
10/01/2018
W/O
0731413
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00323
PipeID
P20065
Time
9:30 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7822
Sewer Name
A JOA-1A LOS COYOTES WRP INTERCEPTOR
City
BELLFLOWER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
32
Purpose
Routine Assessment
Project
20180927DF_JOA_1A_LOS_COYOTES_WRP_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
78 in.
Upstream MH
2 DOWNEY-BELLFLOWER RELIE
Downstream MH
A 0182
Dir. of Survey
Downstream
Length Surveyed
468.9 ft.
Total Length
468.9 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 2 DOWNEY-BELLFLOWER RELIE to A 0182
MH: 2 DOWNEY-BELLFLOWER RELIEMH: A 0182downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 10:20 AM0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 85% MAG2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start14 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open46.4 ft. MGP - General Photograph140.4 ft. MGP - General Photograph231.1 ft. MGP - General Photograph317.5 ft. MGP - General Photograph464.7 ft. MGP - General Photograph464.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish464.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish464.7 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 75% MAG466.9 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)466.9 ft. MGO - General Observation - Peeling & Flaking Throughout The Reach468.9 ft. AMH - Downstream Manhole, Survey Ends - 12:05 PM

Observation photos (9)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 85% MAG

    2 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 85% MAG

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open

    14 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open

  • General Photograph

    46.4 ft. - General Photograph

  • General Photograph

    140.4 ft. - General Photograph

  • General Photograph

    231.1 ft. - General Photograph

  • General Photograph

    317.5 ft. - General Photograph

  • General Photograph

    464.7 ft. - General Photograph

Observations (18)

DistanceCodeObservation
231.1MGP
14TFOpen
464.7MGP
46.4MGP
2SSS
2SZ85% MAG
464.7SSS
466.9MGOGREASE THROUGHOUT THE REACH (5%)
464.7SAV
140.4MGP
317.5MGP
468.9AMH12:05 PM
464.7SZ75% MAG
0MWL
2SAV
466.9MGOPeeling & Flaking Throughout The Reach
0AMH10:20 AM
0MWM

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2018-10-01T09:30:50-07:00
documentation
FRANKLIN, SHADLER, PARAISO, CASTILLO
is_lateral_inspection
false