Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 21, 2018, 05:17 PM
  • 02 2337_02 2336_6212018_103319.mp4

Date
06/21/2018
W/O
0712243
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00896
PipeID
P20967
Time
10:17 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7736
Sewer Name
02 ARTHUR AVENUE TRUNK
City
PARAMOUNT
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
31
Purpose
Routine Assessment
Project
20180621DF_ARTHUR_AVENUE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
02 2337
Downstream MH
02 2336
Dir. of Survey
Downstream
Length Surveyed
318 ft.
Total Length
318 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 02 2337 to 02 2336
MH: 02 2337MH: 02 2336downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:18 AM0.1 ft. MWL - Water Level, 20 %of cross sectional area0.1 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open58 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open98 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"101.1 ft. MGP - General Photograph139.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"175.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"217.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open255.4 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"315.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish318 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active318 ft. MGO - General Observation - ROACHES @ MH318 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH (5%)318 ft. AMH - Downstream Manhole, Survey Ends - 10:51 AM

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    101.1 ft. - General Photograph

Observations (17)

DistanceCodeObservation
318MGOConn. @ Mh, 9 O' Clock. Active
101.1MGP
0AMH10:18 AM
0.1MWL
255.4TFA
315.5SSS
175.1TFA
318MGOROACHES @ MH
2SSS
318MGOGREASE THROUGHOUT THE REACH (5%)
139.5TFA
98TFA
58TFOpen
318AMH10:51 AM
0.1MWM
217.7TFOpen
21.8TFOpen

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-06-21T10:17:14-07:00
documentation
FRANKLIN, VENDRYES
is_lateral_inspection
false