Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 21, 2018, 04:00 PM
  • 02 2339_02 2338_6212018_090246.mp4

Date
06/21/2018
W/O
0712243
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00896
PipeID
P20969
Time
9:00 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7736
Sewer Name
02 ARTHUR AVENUE TRUNK
City
PARAMOUNT
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
31
Purpose
Routine Assessment
Project
20180621DF_ARTHUR_AVENUE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
02 2339
Downstream MH
02 2338
Dir. of Survey
Downstream
Length Surveyed
349.7 ft.
Total Length
349.7 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
3
Pipe schematic from manhole 02 2339 to 02 2338
MH: 02 2339MH: 02 2338downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 9:01 AM0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start11.4 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open33.6 ft. MGP - General Photograph53.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"91.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"104.7 ft. MGP - General Photograph128.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"129.9 ft. MGP - General Photograph168.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - Open244.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"283.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4"283.8 ft. RFL - Roots Fine Lateral, at 11 o'clock - 10%326.4 ft. MGP - General Photograph346.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish349.7 ft. MGO - General Observation - ROACHES @ MH349.7 ft. MGP - General Photograph349.7 ft. AMH - Downstream Manhole, Survey Ends - 9:20 AM

Observation photos (8)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    33.6 ft. - General Photograph

  • General Photograph

    104.7 ft. - General Photograph

  • General Photograph

    129.9 ft. - General Photograph

  • Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4"

    283.8 ft. - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4"

  • Roots Fine Lateral, at 11 o'clock - 10%

    283.8 ft. - Roots Fine Lateral, at 11 o'clock - 10%

  • General Photograph

    326.4 ft. - General Photograph

  • General Photograph

    349.7 ft. - General Photograph

Observations (20)

DistanceCodeObservation
11.4TBOpen
349.7MGOROACHES @ MH
168.3TFOpen
0MWM
104.7MGP
326.4MGP
283.8TF
2SSS
0AMH9:01 AM
33.6MGP
91.3TFA
129.9MGP
0MWL
346.5SSS
53.4TFA
244.6TFA
283.8RFL10%
349.7MGP
349.7AMH9:20 AM
128.7TFA

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2018-06-21T09:00:29-07:00
documentation
FRANKLIN, VENDRYES
is_lateral_inspection
false