Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 8, 2018, 09:48 AM
  • C 0210_C 0209_682018_025242.mp4

Date
06/08/2018
W/O
0706820
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00124
PipeID
P09602
Time
2:48 AM
Certificate
U-014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0886
Sewer Name
C JOINT OUTFALL C - UNIT 3E
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
14
Purpose
Capital Improvement Program Assesment
Project
20180604MDM_JOINT_OUTFALL_C_UNIT_3E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
C 0210
Downstream MH
C 0209
Dir. of Survey
Downstream
Length Surveyed
308.6 ft.
Total Length
308.6 ft.
Structural Index
2
Structural Quick
2700
Structural Rating
14
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
16
Pipe schematic from manhole C 0210 to C 0209
MH: C 0210MH: C 0209downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:50AM0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. MGO - General Observation - MAG COAT 100% START 8:00 TO 4:0020.2 ft. SSS - Surface Spalling, from 01 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE26.6 ft. SSS - Surface Spalling, from 08 to 01 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE30.5 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - INDUSTRIAL WASTE48.8 ft. MGO - General Observation - HOT SEWAGE SHUT OFF CAMERA48.8 ft. SSS - Surface Spalling, from 02 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE71.8 ft. MGO - General Observation - MAG COAT 70% START76.8 ft. SSS - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE122.7 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE INDUSTRIAL WASTE146.7 ft. SSS - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE182.9 ft. MGO - General Observation - SLIME COAT ON PIPE FROM HOT OILY SEWAGE242.2 ft. SSS - Surface Spalling, from 08 to 10 o'clock, within 8 inches of joint: NO - PEELING CONCRETE308 ft. MGO - General Observation - MAG COAT 70% FINISH308 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE308 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Capped308.6 ft. AMH - Downstream Manhole, Survey Ends - 4:30AM

Observation photos (8)

  • General Observation - MAG COAT 100% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 100% START 8:00 TO 4:00

  • Surface Spalling, from 01 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

    20.2 ft. - Surface Spalling, from 01 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

  • Surface Spalling, from 08 to 01 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE

    26.6 ft. - Surface Spalling, from 08 to 01 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - INDUSTRIAL WASTE

    30.5 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - INDUSTRIAL WASTE

  • Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

    76.8 ft. - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

  • Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

    146.7 ft. - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

  • General Observation - SLIME COAT ON PIPE FROM HOT OILY SEWAGE

    182.9 ft. - General Observation - SLIME COAT ON PIPE FROM HOT OILY SEWAGE

  • Surface Spalling, from 08 to 10 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    242.2 ft. - Surface Spalling, from 08 to 10 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

Observations (20)

DistanceCodeObservation
0AMH2:50AM
48.8MGOHOT SEWAGE SHUT OFF CAMERA
308.6AMH4:30AM
242.2SSSPEELING CONCRETE
308MGOMAG COAT 70% FINISH
182.9MGOSLIME COAT ON PIPE FROM HOT OILY SEWAGE
2SSSBLISTERING PEELING CONCRETE
146.7SSSBLISTERING CONCRETE
20.2SSSBLISTERING CONCRETE
76.8SSSBLISTERING CONCRETE
308SSSBLISTERING PEELING CONCRETE
48.8SSSPEELING CONCRETE
122.7DSZSLUDGE INDUSTRIAL WASTE
71.8MGOMAG COAT 70% START
2MGOMAG COAT 100% START 8:00 TO 4:00
0MWL
308MGOConn. @ Mh, 9 O' Clock. Capped
0MWM
30.5DSZINDUSTRIAL WASTE
26.6SSSBLISTERING PEELING CONCRETE

Properties (6)

custom_field_three
BLISTERIN PEELING CONCRETE--70% MAG COAT
custom_field_two
4
customer
LACSD
datetime
2018-06-08T02:48:05-07:00
documentation
MARTIN,REVELES,OLIVER 111,YOUNG
is_lateral_inspection
false