Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 8, 2018, 08:52 AM
  • C 0211_C 0210_682018_020917.mp4

Date
06/08/2018
W/O
0706820
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00124
PipeID
P09603
Time
1:52 AM
Certificate
U-014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0886
Sewer Name
C JOINT OUTFALL C - UNIT 3E
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
14
Purpose
Capital Improvement Program Assesment
Project
20180604MDM_JOINT_OUTFALL_C_UNIT_3E
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
C 0211
Downstream MH
C 0210
Dir. of Survey
Downstream
Length Surveyed
291.8 ft.
Total Length
291.8 ft.
Structural Index
2
Structural Quick
2600
Structural Rating
12
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
14
Pipe schematic from manhole C 0211 to C 0210
MH: C 0211MH: C 0210downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:10AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 100% START 8:00 TO 4:002 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERIN PEELING CONCRETE UNDER MAG COAT16.6 ft. SSS - Surface Spalling, from 01 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE35.3 ft. SSS - Surface Spalling, from 03 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE68.4 ft. SSS - Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE78.8 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Start - SLUDGE INDUSTRIAL WASTE126.7 ft. MWL - Water Level, 15 %of cross sectional area133.4 ft. MGO - General Observation - MAG COAT 98% START133.4 ft. SSS - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES - BLISTERING CONCRETE262.6 ft. SSS - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE291.3 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Finish - SLUDGE INDUSTRIAL WASTE291.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE291.3 ft. MGO - General Observation - MAG COAT 98% FINISH291.8 ft. AMH - Downstream Manhole, Survey Ends - 2:40AM

Observation photos (8)

  • General Observation - MAG COAT 100% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 100% START 8:00 TO 4:00

  • Surface Spalling, from 01 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

    16.6 ft. - Surface Spalling, from 01 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE

  • Surface Spalling, from 03 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

    35.3 ft. - Surface Spalling, from 03 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

  • Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    68.4 ft. - Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: NO, Start - SLUDGE INDUSTRIAL WASTE

    78.8 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Start - SLUDGE INDUSTRIAL WASTE

  • General Observation - MAG COAT 98% START

    133.4 ft. - General Observation - MAG COAT 98% START

  • Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES - BLISTERING CONCRETE

    133.4 ft. - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES - BLISTERING CONCRETE

  • Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

    262.6 ft. - Surface Spalling, from 08 to 11 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE

Observations (17)

DistanceCodeObservation
16.6SSSBLISTERING PEELING CONCRETE
291.3DSZSLUDGE INDUSTRIAL WASTE
133.4MGOMAG COAT 98% START
0AMH2:10AM
262.6SSSBLISTERING CONCRETE
2MGOMAG COAT 100% START 8:00 TO 4:00
0MWL
2SSSBLISTERIN PEELING CONCRETE UNDER MAG COAT
35.3SSSBLISTERING CONCRETE
291.8AMH2:40AM
291.3SSSBLISTERING PEELING CONCRETE
126.7MWL
68.4SSSPEELING CONCRETE
78.8DSZSLUDGE INDUSTRIAL WASTE
291.3MGOMAG COAT 98% FINISH
0MWM
133.4SSSBLISTERING CONCRETE

Properties (6)

custom_field_three
BLISTERING PEELING CONCRETE--98% MAG COAT
custom_field_two
4
customer
LACSD
datetime
2018-06-08T01:52:58-07:00
documentation
MARTIN,REVELES,OLIVER 111,YOUNG
is_lateral_inspection
false