05 1254A_05 1254_6302017_134658.mp4
8.3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
8.3 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
41.2 ft. - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"
60.7 ft. - General Observation - GREASE DEPOSITS, FROM 3 TO 9, OCLOCK, 10%
111.5 ft. - Downstream Manhole, Survey Ends - 02:00PM
111.5 ft. - General Observation - CONNECTION AT MH, 9 OCLOCK, ACTIVE
| Distance | Code | Observation |
|---|---|---|
| 107.5 | DAGS | — |
| 107.5 | SSS | — |
| 41.2 | TBA | — |
| 60.7 | MGO | GREASE DEPOSITS, FROM 3 TO 9, OCLOCK, 10% |
| 8.3 | SSS | — |
| 0 | MWM | — |
| 111.5 | AMH | 02:00PM |
| 111.5 | MGO | CONNECTION AT MH, 3 OCLOCK, CAPPED |
| 8.3 | DAGS | — |
| 0 | MGO | CONNECTION AT MH, 9 OCLOCK, ACTIVE |
| 111.5 | MGO | CONNECTION AT MH, 9 OCLOCK, ACTIVE |
| 0 | AMH | 01:45 PM |
| 0 | MWL | — |