Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 31, 2016, 07:23 PM
  • 02 1889_02 1888_10312016_130748.mp4

Date
10/31/2016
W/O
0602275
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z01172
PipeID
P04253
Time
12:23 PM
Certificate
U-115-06022628
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7263
Sewer Name
02 DOUGLAS AVENUE RELOCATION TRUNK
City
EAST LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
08
Purpose
Routine Assessment
Project
20161031MI_DOUGLAS_AVENUE_RELOCATION_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Upstream MH
02 1889
Downstream MH
02 1888
Dir. of Survey
Downstream
Length Surveyed
13.2 ft.
Total Length
13.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 02 1889 to 02 1888
MH: 02 1889MH: 02 1888downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01:00PM0 ft. MWM - Water Mark, 10 %of cross sectional area5.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES13.2 ft. AMH - Downstream Manhole, Survey Ends - 01:12PM13.2 ft. MGO - General Observation - CONNECTION AT MH, 4 OCLOCK, ACTIVE13.2 ft. MGO - General Observation - ROACHES MH

Observation photos (1)

  • Downstream Manhole, Survey Ends - 01:12PM

    13.2 ft. - Downstream Manhole, Survey Ends - 01:12PM

Observations (7)

DistanceCodeObservation
13.2AMH01:12PM
0MWL
0AMH01:00PM
13.2MGOCONNECTION AT MH, 4 OCLOCK, ACTIVE
5.6DAGS
0MWM
13.2MGOROACHES MH

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2016-10-31T12:23:14-07:00
documentation
IGNACIO, FRANKLIN, SHADLER, BRAR
is_lateral_inspection
false