Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 27, 2016, 03:26 PM
  • 29 0406_29 0405_10272016_083609.mp4

Date
10/27/2016
W/O
0597283
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z01090
PipeID
P24443
Time
8:26 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7257
Sewer Name
29 ALAMITOS PUMPING PLANT SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Capital Improvement Program Assesment
Project
20161027AM_ALAMITOS_PUMPING_PLANT_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0405
Downstream MH
29 0406
Dir. of Survey
Upstream
Length Surveyed
207.9 ft.
Total Length
207.9 ft.
Structural Index
4
Structural Quick
5441
Structural Rating
36
O&M Index
2
O&M Quick
4125
O&M Rating
14
Overall Index
3
Overall Quick
Overall Rating
50
Pipe schematic from manhole 29 0405 to 29 0406
MH: 29 0405MH: 29 0406upstream0 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. MSA - Survey Abandoned - PROTRUDING BREAK-IN CONN.0 ft. MGO - General Observation - SLIGHT GREASE THROUGHOUT THE REACH0.9 ft. TBI - Tap Break-In Intruding, at 09 o'clock, -, -, within 8 inches of joint: YES, 6", 2" - OPEN8.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN22.5 ft. B - Broken, from 04 to 08 o'clock, within 8 inches of joint: YES29.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN42.1 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 6"73 ft. TFD - Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, CRACKED83.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN111.9 ft. TFD - Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, BROKEN114.4 ft. TFD - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, BROKEN163.5 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, CRACKED168.5 ft. TFD - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, BROKEN169.7 ft. B - Broken, from 08 to 04 o'clock, within 8 inches of joint: YES172.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start174.8 ft. CM - Crack Multiple, from 09 to 04 o'clock, within 8 inches of joint: YES180 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES187.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES198.2 ft. B - Broken, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish199.6 ft. TFD - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, BROKEN201.3 ft. FM - Fracture Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES - POSSIBLY BROKEN201.4 ft. B - Broken, from 08 to 02 o'clock, within 8 inches of joint: YES, Start203.3 ft. B - Broken, from 12 to 12 o'clock, within 8 inches of joint: YES207.9 ft. AMH - Downstream Manhole, Survey Begins - 8:29 AM, PIPE IN THE MIDDLE OF THE STACK207.9 ft. MGO - General Observation - ROACHES INSIDE THE MH.207.9 ft. MWL - Water Level, 5 %of cross sectional area207.9 ft. MWM - Water Mark, 10 %of cross sectional area

Observation photos (14)

  • Water Level, 5 %of cross sectional area

    0 ft. - Water Level, 5 %of cross sectional area

  • Broken, from 12 to 12 o'clock, within 8 inches of joint: YES

    4.6 ft. - Broken, from 12 to 12 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES - POSSIBLY BROKEN

    6.6 ft. - Fracture Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES - POSSIBLY BROKEN

  • Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, BROKEN

    8.3 ft. - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, BROKEN

  • Broken, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    9.7 ft. - Broken, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

  • Broken, from 08 to 04 o'clock, within 8 inches of joint: YES

    38.2 ft. - Broken, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, BROKEN

    39.4 ft. - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, BROKEN

  • Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, CRACKED

    44.4 ft. - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, CRACKED

  • Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, BROKEN

    93.5 ft. - Tap Factory Made Defective, at 03 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, BROKEN

  • Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, BROKEN

    96 ft. - Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE, BROKEN

  • Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, CRACKED

    134.9 ft. - Tap Factory Made Defective, at 09 o'clock, -, within 8 inches of joint: YES, 6" - OPEN, CRACKED

  • Broken, from 04 to 08 o'clock, within 8 inches of joint: YES

    185.4 ft. - Broken, from 04 to 08 o'clock, within 8 inches of joint: YES

  • Tap Break-In Intruding, at 09 o'clock, -, -, within 8 inches of joint: YES, 6", 2" - OPEN

    207 ft. - Tap Break-In Intruding, at 09 o'clock, -, -, within 8 inches of joint: YES, 6", 2" - OPEN

  • Survey Abandoned - PROTRUDING BREAK-IN CONN.

    207.9 ft. - Survey Abandoned - PROTRUDING BREAK-IN CONN.

Observations (28)

DistanceCodeObservation
4.6B
39.4TFDOPEN, BROKEN
0AMH8:29 AM, PIPE IN THE MIDDLE OF THE STACK
33.1CM
0MGOROACHES INSIDE THE MH.
185.4B
93.5TFDACTIVE, BROKEN
134.9TFDOPEN, CRACKED
8.3TFDACTIVE, BROKEN
0MWL
35.7CM
27.9CM
20.1CM
124.7TFOPEN
207.9CM
44.4TFOPEN, CRACKED
199.1TFOPEN
9.7B
96TFDACTIVE, BROKEN
6.6FMPOSSIBLY BROKEN
207.9MSAPROTRUDING BREAK-IN CONN.
207.9MGOSLIGHT GREASE THROUGHOUT THE REACH
38.2B
207TBIOPEN
165.8TFA
178.8TBOPEN
0MWM
6.5B

Properties (7)

additional_info
RFIR INSPECTION
custom_field_three
BROKEN PIPE, 2" PROTRUDING CONN. 207' U/S
custom_field_two
1
customer
LACSD
datetime
2016-10-27T08:26:16-07:00
documentation
MIRANDA, FRANKLIN, SHADLER, BRAR
is_lateral_inspection
false