16 0100_16 0099_10272016_041031.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING LAITANCE COAT
2 ft. - General Observation - 60%MAG COAT 8:00 TO4:00 START
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG
26.1 ft. - Surface Aggregate Projecting, from 02 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG
48.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
183.4 ft. - General Observation - MAG COAT 70% START
189.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 48.9 | SAP | SEVERE AGG |
| 2 | SSS | PEELING LAITANCE COAT |
| 2 | MGO | 60%MAG COAT 8:00 TO4:00 START |
| 26.1 | SAP | SEVERE AGG |
| 189.9 | SAP | SEVERE AGG |
| 0 | MWL | — |
| 376.3 | SAP | SEVERE AGG |
| 0 | AMH | 3:55AM |
| 376.9 | AMH | 4:30AM |
| 183.4 | MGO | MAG COAT 70% START |
| 376.3 | MGO | MAG COAT 70% FINISH |
| 376.3 | SSS | PEELING LAITANCE COAT |
| 2 | SAV | SEVERE AGG |
| 0 | MWM | — |