Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 15, 2016, 08:24 AM
  • 22 0516_22 0515_10152016_024633.mp4

Date
10/15/2016
W/O
0591578
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00791
PipeID
P16856
Time
1:24 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
HO323
Sewer Name
22 BEN LOMOND TRUNK
City
COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
26
Purpose
Routine Assessment
Project
20161015MDM_BEN_LOMOND_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
22 0516
Downstream MH
22 0515
Dir. of Survey
Downstream
Length Surveyed
424.8 ft.
Total Length
424.8 ft.
Structural Index
2
Structural Quick
3123
Structural Rating
9
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
11
Pipe schematic from manhole 22 0516 to 22 0515
MH: 22 0516MH: 22 0515downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. OPEN0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:40AM2.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: NO9.8 ft. MGO - General Observation - 15" VCP55.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped60.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped106.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped110 ft. FL - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES - H111.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped155.7 ft. FC - Fracture Circumferential, from 09 to 11 o'clock, within 8 inches of joint: YES - HAIRLINE157.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open162.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped202.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped207.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped253.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped258.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped282.5 ft. FC - Fracture Circumferential, from 11 to 12 o'clock, within 8 inches of joint: YES - H302.8 ft. FC - Fracture Circumferential, from 09 to 12 o'clock, within 8 inches of joint: YES - H303.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped309.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped359.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped364.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped405.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open410.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped424.3 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active424.8 ft. AMH - Downstream Manhole, Survey Ends - 3:15AM

Observation photos (1)

  • General Observation - 15" VCP

    9.8 ft. - General Observation - 15" VCP

Observations (28)

DistanceCodeObservation
405.8TFOpen
202.7TFCCapped
106.6TFCCapped
364.8TFCCapped
282.5FCH
0MWL
111.6TFCCapped
0MGOConn. @ Mh, 9 O' Clock. OPEN
60.9TFCCapped
0MWM
207.5TFCCapped
309.1TFCCapped
157.1TFOpen
424.3MGOConn. @ Mh, 9 O' Clock. Active
424.8AMH3:15AM
253.2TFCCapped
155.7FCHAIRLINE
0AMH2:40AM
110FLH
2.8DAGS
303.8TFCCapped
9.8MGO15" VCP
55.8TFCCapped
359.9TFCCapped
302.8FCH
258.3TFCCapped
410.7TFCCapped
162.1TFCCapped

Properties (6)

custom_field_three
FEW HAIRLINES
custom_field_two
4
customer
LACSD
datetime
2016-10-15T01:24:45-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false