Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 14, 2016, 07:26 AM
  • 05 0899_05 0898_10142016_005935.mp4

Date
10/14/2016
W/O
0596954
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00512
PipeID
P06129
Time
12:26 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0321
Sewer Name
05 RAYMOND AVENUE TRUNK
City
HAWTHORNE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
13
Purpose
Capital Improvement Program Assesment
Project
20161014MDM_RAYMOND_AVENUE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
05 0899
Downstream MH
05 0898
Dir. of Survey
Downstream
Length Surveyed
315.7 ft.
Total Length
315.7 ft.
Structural Index
2
Structural Quick
5135
Structural Rating
52
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
55
Pipe schematic from manhole 05 0899 to 05 0898
MH: 05 0899MH: 05 0898downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:30AM3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SURFACE PEELING SPORATIC4 ft. FC - Fracture Circumferential, from 12 to 03 o'clock, within 8 inches of joint: YES - SLIGHT8 ft. MGO - General Observation - 8" VCP10 ft. FC - Fracture Circumferential, from 11 to 02 o'clock, within 8 inches of joint: YES - HAIRLINE15 ft. FC - Fracture Circumferential, from 11 to 01 o'clock, within 8 inches of joint: YES - H20 ft. FL - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES - H20.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open25.1 ft. FL - Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES - H27.6 ft. FC - Fracture Circumferential, from 12 to 03 o'clock, within 8 inches of joint: YES - S27.6 ft. FC - Fracture Circumferential, from 10 to 12 o'clock, within 8 inches of joint: YES - S30 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES - H30 ft. FC - Fracture Circumferential, from 09 to 11 o'clock, within 8 inches of joint: YES - H32.8 ft. FC - Fracture Circumferential, from 09 to 12 o'clock, within 8 inches of joint: YES - S47.8 ft. FC - Fracture Circumferential, from 10 to 11 o'clock, within 8 inches of joint: YES - H47.8 ft. FC - Fracture Circumferential, from 01 to 03 o'clock, within 8 inches of joint: YES - S50.3 ft. FC - Fracture Circumferential, from 12 to 02 o'clock, within 8 inches of joint: YES - S55.4 ft. FC - Fracture Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - HAIRLINE AT JOINTS55.4 ft. FL - Fracture Longitudinal, at 09 TO 03 o'clock, within 8 inches of joint: YES, Start - SLIGHT AT JOINTS55.4 ft. FL - Fracture Longitudinal, at 09 TO 3 o'clock, within 8 inches of joint: YES, Start - HAIRLINE AT JOINTS55.4 ft. FC - Fracture Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SLIGHT AT JOINTS68.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped81.1 ft. FC - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES81.5 ft. SMW - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: NO - 2" X2" SOIL VISIBLE-POSSIBLE VOID81.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6", 6" - Open127.4 ft. FC - Fracture Circumferential, from 01 to 02 o'clock, within 8 inches of joint: YES - MODERATE-POSSIBLE SOIL VISIBLE127.6 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN128.6 ft. FC - Fracture Circumferential, from 09 to 12 o'clock, within 8 inches of joint: YES - MODERATE147.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open161.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped174.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open207.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped222.3 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open237.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open258 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped288.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open290.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped292.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SURFACE PEELING292.5 ft. MGO - General Observation - APPEARS NEWER PPE301.4 ft. TBI - Tap Break-In Intruding, at 02 o'clock, -, -, within 8 inches of joint: YES, 6", 1"INTRUDING - Open302.8 ft. MGO - General Observation - OLD PIPE STARTS315.4 ft. FC - Fracture Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - 40% HAIRLINE315.4 ft. FL - Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES, Finish - 20% HAIRLINE315.4 ft. FL - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES, Finish - 20% SLIGHT315.4 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active315.4 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active315.4 ft. FC - Fracture Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - 40% SLIGHT315.7 ft. AMH - Downstream Manhole, Survey Ends - 3:50AM

Observation photos (7)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SURFACE PEELING SPORATIC

    3 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SURFACE PEELING SPORATIC

  • General Observation - 8" VCP

    8 ft. - General Observation - 8" VCP

  • Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: NO - 2" X2" SOIL VISIBLE-POSSIBLE VOID

    81.5 ft. - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: NO - 2" X2" SOIL VISIBLE-POSSIBLE VOID

  • Fracture Circumferential, from 01 to 02 o'clock, within 8 inches of joint: YES - MODERATE-POSSIBLE SOIL VISIBLE

    127.4 ft. - Fracture Circumferential, from 01 to 02 o'clock, within 8 inches of joint: YES - MODERATE-POSSIBLE SOIL VISIBLE

  • Fracture Circumferential, from 09 to 12 o'clock, within 8 inches of joint: YES - MODERATE

    128.6 ft. - Fracture Circumferential, from 09 to 12 o'clock, within 8 inches of joint: YES - MODERATE

  • General Observation - APPEARS NEWER PPE

    292.5 ft. - General Observation - APPEARS NEWER PPE

  • Tap Break-In Intruding, at 02 o'clock, -, -, within 8 inches of joint: YES, 6", 1"INTRUDING - Open

    301.4 ft. - Tap Break-In Intruding, at 02 o'clock, -, -, within 8 inches of joint: YES, 6", 1"INTRUDING - Open

Observations (51)

DistanceCodeObservation
81.5SMW2" X2" SOIL VISIBLE-POSSIBLE VOID
315.4FC40% HAIRLINE
32.8FCS
47.8FCH
27.6FCS
81.1FC
10FCHAIRLINE
161.7TFCCapped
55.4FCHAIRLINE AT JOINTS
0MWL
301.4TBIOpen
0MGOConn. @ Mh, 3 O' Clock. Active
292.5SSSSURFACE PEELING
128.6FCMODERATE
25.1FLH
30FLH
258TFCCapped
55.4FLSLIGHT AT JOINTS
174.2TBOpen
55.4FLHAIRLINE AT JOINTS
0MWM
315.4FL20% HAIRLINE
315.4FL20% SLIGHT
127.4FCMODERATE-POSSIBLE SOIL VISIBLE
4FCSLIGHT
27.6FCS
302.8MGOOLD PIPE STARTS
288.1TFOpen
8MGO8" VCP
50.3FCS
147.1TFOpen
127.6TBOPEN
3SSSSURFACE PEELING SPORATIC
81.5TBOpen
47.8FCS
55.4FCSLIGHT AT JOINTS
20.9TFOpen
315.4MGOConn. @ Mh, 3 O' Clock. Active
68.9TFCCapped
315.7AMH3:50AM
207.3TFCCapped
30FCH
315.4MGOConn. @ Mh, 9 O' Clock. Active
15FCH
0AMH2:30AM
290.7TFCCapped
20FLH
315.4FC40% SLIGHT
237.7TFOpen
222.3TBOpen
292.5MGOAPPEARS NEWER PPE

Properties (6)

custom_field_three
MISSING WALL 2" X2" AT 2:00 SOIL VISIBLE
custom_field_two
1
customer
LACSD
datetime
2016-10-14T00:26:53-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection