Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 6, 2016, 12:30 PM
  • 02 1824_02 1823A_1062016_053351.mp4

Date
10/06/2016
W/O
0596932
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00236
PipeID
P25919
Time
5:30 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0313
Sewer Name
02 ATLANTIC AVENUE RELIEF TRUNK
City
LOS ANGLES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
10161006MDM_ATLANTIC_AVENUE_RELIEF_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
02 1824
Downstream MH
02 1823A
Dir. of Survey
Downstream
Length Surveyed
66.7 ft.
Total Length
66.7 ft.
Structural Index
2
Structural Quick
3122
Structural Rating
7
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 02 1824 to 02 1823A
MH: 02 1824MH: 02 1823Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 5:35AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 40% START2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE11.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE66.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active66.2 ft. MGO - General Observation - 40% MAG COAT FINISH66.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE66.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG66.7 ft. AMH - Downstream Manhole, Survey Ends - 5:50AM

Observation photos (4)

  • General Observation - MAG COAT 40% START

    2 ft. - General Observation - MAG COAT 40% START

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    11.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

Observations (12)

DistanceCodeObservation
2MGOMAG COAT 40% START
66.2MGOConn. @ Mh, 3 O' Clock. Active
66.2MGO40% MAG COAT FINISH
0AMH5:35AM
2SAPSEVERE AGG
0MWL
66.2SSSPEELING CONCRETE
66.2SAPSEVERE AGG
0MWM
66.7AMH5:50AM
2SSSPEELING CONCRETE
11.4SSSPEELING CONCRETE

Properties (6)

custom_field_three
PEELING CONCRETE-SEVERE PROJECTING AGG
custom_field_two
2
customer
LACSD
datetime
2016-10-06T05:30:13-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false