Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 5, 2019, 09:05 AM
  • 18 0086_18 0085 _06052019_021457.mp4

Date
06/05/2019
W/O
766605
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00698
PipeID
P13905
Time
2:05 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6559
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
WO_766605_TV18083_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0086
Downstream MH
18 0085
Dir. of Survey
Downstream
Length Surveyed
313.6 ft.
Total Length
313.6 ft.
Structural Index
3
Structural Quick
413X
Structural Rating
498
O&M Index
2
O&M Quick
2K00
O&M Rating
124
Overall Index
3
Overall Quick
Overall Rating
622
Pipe schematic from manhole 18 0086 to 18 0085
MH: 18 0086MH: 18 0085downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 00860 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start12.5 ft. FL - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES113.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"213.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"288.5 ft. FH2 - Fracture Longitudinal Hinge, 2, from 12 to 03 o'clock, within 8 inches of joint: YES309 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish309 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish310.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish310.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish311 ft. MGO - General Observation - ROACHES @ MH313.6 ft. AMH - Downstream Manhole, Survey Ends - 18 0085

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    12.5 ft. - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal Hinge, 2, from 12 to 03 o'clock, within 8 inches of joint: YES

    288.5 ft. - Fracture Longitudinal Hinge, 2, from 12 to 03 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
12.5FL
2.8DAGS
309CM
2SSS
2CM
0MWM
311MGOROACHES @ MH
113.4TFC
2.8SAP
310.7SAP
313.6AMH18 0085
0AMH18 0086
213.4TFC
309SSS
0MWL
310.7DAGS
288.5FH2

Properties (6)

additional_info
SC377681
custom_field_two
3
customer
LACSD
datetime
2019-06-05T02:05:03-07:00
documentation
PROPIPE
is_lateral_inspection
false