Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 1, 2019, 06:25 AM
  • 18 0110_18 0109 _05312019_233127.mp4

Date
05/31/2019
W/O
766605
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00698
PipeID
P13930
Time
11:25 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6556
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
WO_766605_TV18083_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0110
Downstream MH
18 0109
Dir. of Survey
Downstream
Length Surveyed
41.9 ft.
Total Length
41.9 ft.
Structural Index
2
Structural Quick
3728
Structural Rating
37
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
41
Pipe schematic from manhole 18 0110 to 18 0109
MH: 18 0110MH: 18 0109downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 01100 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. MGO - General Observation - CONNECTION IN MH 3 OCLOCK/CAPPED2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start33.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - ACTIVE39.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"39.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish39.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish41 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish41.9 ft. MGO - General Observation - CONNECTION IN MH 3 OCLOCK/ACTIVE41.9 ft. AMH - Downstream Manhole, Survey Ends - 18 0109

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
39.3TFC
41.9MGOCONNECTION IN MH 3 OCLOCK/ACTIVE
0MWM
39.9DAGS
0AMH18 0110
33.1TFACTIVE
0MWL
2.7DAGS
2.7SAP
2SSS
41SSS
0MGOROACHES @ MH
0MGOCONNECTION IN MH 3 OCLOCK/CAPPED
41.9AMH18 0109
39.9SAP

Properties (6)

additional_info
SC377678
custom_field_two
3
customer
LACSD
datetime
2019-05-31T23:25:52-07:00
documentation
PROPIPE
is_lateral_inspection
false