4.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
4.7 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
24.8 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
42.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
42.3 ft. - Fracture Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES, Start
168.1 ft. - Repair Localized Liner, within 8 inches of joint: NO - CIPP
| Distance | Code | Observation |
|---|---|---|
| 321.7 | TFC | — |
| 0 | AMH | 18 0119 |
| 227.8 | TFC | — |
| 71.6 | TFC | — |
| 356.7 | DAGS | — |
| 170 | TF | OPEN |
| 127.4 | TFC | — |
| 2 | CM | — |
| 42.2 | SAP | — |
| 4.6 | DAGS | — |
| 176 | TFC | — |
| 356.6 | SAP | — |
| 77.4 | TFC | — |
| 357 | SSS | — |
| 24.8 | SRI | — |
| 358.2 | AMH | 18 0118 |
| 357 | CM | — |
| 358 | MGO | ROACHES @ MH |
| 221.7 | TF | OPEN |
| 2 | SSS | — |
| 0 | MWL | — |
| 24.8 | TFC | — |
| 24.8 | SAV | — |
| 20.6 | TF | OPEN |
| 276 | TFC | — |
| 4.7 | SRI | — |
| 121.6 | TF | — |
| 356.6 | FS | — |
| 0 | MWM | — |
| 168.1 | RPL | CIPP |
| 42.2 | SAV | — |
| 42.3 | FS | — |
| 328 | TFC | — |