Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 31, 2019, 09:33 AM
  • 18 0123_18 0122 _05312019_024608.mp4

Date
05/31/2019
W/O
766605
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00698
PipeID
P13944
Time
2:33 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6556
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
WO_766605_TV18083_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0122
Downstream MH
18 0123
Dir. of Survey
Upstream
Length Surveyed
336.6 ft.
Total Length
336.6 ft.
Structural Index
3
Structural Quick
3Y2L
Structural Rating
518
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
522
Pipe schematic from manhole 18 0122 to 18 0123
MH: 18 0122MH: 18 0123upstream0 ft. AMH - Upstream Manhole, Survey Ends - 18 01230 ft. MGO - General Observation - CONNECTIONS IN MH 3 AND 9 OCLOCK/OPEN0.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish1.1 ft. FS - Fracture Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish1.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish57.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"63.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"109 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"115.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN157.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN163.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"209 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6", 6"214.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN257.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"258.3 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 4", 4"263.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6"292.6 ft. FS - Fracture Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES, Start310.7 ft. FL - Fracture Longitudinal, at 01 o'clock, within 8 inches of joint: YES334.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start334.2 ft. DAGS - Deposits Attached Grease, 0 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start334.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start334.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start336.6 ft. MWL - Water Level, 10 %of cross sectional area336.6 ft. AMH - Downstream Manhole, Survey Begins - 18 0122336.6 ft. MWM - Water Mark, 15 %of cross sectional area336.6 ft. MGO - General Observation - CONNECTION IN MH 9 OCLOCK/OPEN

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 0 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.4 ft. - Deposits Attached Grease, 0 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 01 o'clock, within 8 inches of joint: YES

    25.9 ft. - Fracture Longitudinal, at 01 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    44 ft. - Fracture Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (28)

DistanceCodeObservation
0MWL
279.4TFC
221.5TFOPEN
335.5SAP
336.6AMH18 0123
0AMH18 0122
335.5DAGS
173.4TFC
2.4SAP
73.3TFA
2CM
0MWM
44FS
127.6TFA
336SSS
335.5FS
273.1TFC
0MGOCONNECTION IN MH 9 OCLOCK/OPEN
179TFOPEN
121.8TFOPEN
2SSS
2.4DAGS
25.9FL
336.6MGOCONNECTIONS IN MH 3 AND 9 OCLOCK/OPEN
335CM
78.3TBA
79.4TFC
227.6TFC

Properties (6)

additional_info
SC377678
custom_field_two
3
customer
LACSD
datetime
2019-05-31T02:33:02-07:00
documentation
PROPIPE
is_lateral_inspection
false