Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 5, 2019, 06:34 AM
  • 18 0096_18 0095 _06042019_234622.mp4

Date
06/04/2019
W/O
766605
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00698
PipeID
P13916
Time
11:34 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6559
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
WO_766605_TV18083_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0096
Downstream MH
18 0095
Dir. of Survey
Downstream
Length Surveyed
287.4 ft.
Total Length
287.4 ft.
Structural Index
3
Structural Quick
3K2J
Structural Rating
283
O&M Index
2
O&M Quick
2J00
O&M Rating
112
Overall Index
2
Overall Quick
Overall Rating
395
Pipe schematic from manhole 18 0096 to 18 0095
MH: 18 0096MH: 18 0095downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 18 00964 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start20.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start182.3 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN284 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish285.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish285.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish285.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish287.4 ft. AMH - Downstream Manhole, Survey Ends - 18 0095

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    20.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
0MWL
0MWM
0CM
0MGOROACHES @ MH
20.1SSS
285.4SAP
287.4AMH18 0095
285.4SSS
0AMH18 0096
4SAP
182.3TBOPEN
284CM
4DAGS
285.4DAGS

Properties (6)

additional_info
SC377681
custom_field_two
2
customer
LACSD
datetime
2019-06-04T23:34:28-07:00
documentation
PROPIPE
is_lateral_inspection
false