Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 31, 2019, 10:02 AM
  • 18 0987_18 0117 _05312019_031821.mp4

Date
05/31/2019
W/O
766605
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00698
PipeID
P13938
Time
3:02 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6556
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
WO_766605_TV18083_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0987
Downstream MH
18 0117
Dir. of Survey
Downstream
Length Surveyed
175.2 ft.
Total Length
175.2 ft.
Structural Index
3
Structural Quick
3M2F
Structural Rating
276
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
276
Pipe schematic from manhole 18 0987 to 18 0117
MH: 18 0987MH: 18 0117downstream0 ft. MGO - General Observation - CONNECTION IN MH 9 OCLOCK0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 09870 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start33.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"39.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"50.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish50.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start83.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN89.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"135.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN141.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"149.6 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES162.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"168.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"173.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish174 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish174 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish174 ft. MGO - General Observation - ROACHES @ MH175.2 ft. AMH - Downstream Manhole, Survey Ends - 18 0117

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    50.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    149.6 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

Observations (24)

DistanceCodeObservation
174SSS
168.4TFC
2CM
174CM
135.4TFOPEN
0MGOCONNECTION IN MH 9 OCLOCK
162.7TFC
141.5TFC
4.5SAV
0MGOROACHES @ MH
175.2AMH18 0117
50.4SAV
50.4SAP
149.6CL
174MGOROACHES @ MH
173.4SAP
39.2TFC
0MWM
83.7TFOPEN
89.6TFC
0MWL
33.3TFC
0AMH18 0987
0SSS

Properties (6)

additional_info
SC377678
custom_field_two
3
customer
LACSD
datetime
2019-05-31T03:02:24-07:00
documentation
PROPIPE
is_lateral_inspection
false