Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 1, 2019, 05:43 AM
  • 18 0112_18 0111 _05312019_231106.mp4

Date
05/31/2019
W/O
766605
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00698
PipeID
P13932
Time
10:43 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6556
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
WO_766605_TV18083_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0112
Downstream MH
18 0111
Dir. of Survey
Downstream
Length Surveyed
61 ft.
Total Length
61 ft.
Structural Index
3
Structural Quick
3D2A
Structural Rating
94
O&M Index
2
O&M Quick
2A00
O&M Rating
22
Overall Index
3
Overall Quick
Overall Rating
116
Pipe schematic from manhole 18 0112 to 18 0111
MH: 18 0112MH: 18 0111downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 01120 ft. MGO - General Observation - ROACHES @ MH0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start9.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN14.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"23.1 ft. FS - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start45.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"51.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"57.7 ft. FS - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish57.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish57.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish58 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish59 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish61 ft. MGO - General Observation - CONNECTION IN MH 3 OCLOCK/ACTIVE61 ft. AMH - Downstream Manhole, Survey Ends - 18 0111

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

    23.1 ft. - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
2SSS
58SSS
0AMH18 0112
57.7FS
61MGOCONNECTION IN MH 3 OCLOCK/ACTIVE
0MGOROACHES @ MH
61AMH18 0111
2CM
0MWM
2.9SAP
2.9DAGS
0MWL
51.4TFC
14.9TFC
57.7SAP
9.6TFOPEN
23.1FS
45.5TFC
59CM
57.7DAGS

Properties (6)

additional_info
SC377678
custom_field_two
3
customer
LACSD
datetime
2019-05-31T22:43:23-07:00
documentation
PROPIPE
is_lateral_inspection
false