Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 5, 2019, 07:21 AM
  • 18 0093_18 0092 _06052019_003009.mp4

Date
06/05/2019
W/O
766605
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00698
PipeID
P13912
Time
12:21 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6559
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
WO_766605_TV18083_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0093
Downstream MH
18 0092
Dir. of Survey
Downstream
Length Surveyed
26.7 ft.
Total Length
26.7 ft.
Structural Index
3
Structural Quick
3A25
Structural Rating
40
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
48
Pipe schematic from manhole 18 0093 to 18 0092
MH: 18 0093MH: 18 0092downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 18 00932 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - CONN 9 O'CLOCK @ MH/ACTIVE2.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start25 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish25 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish25.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish25.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish26 ft. MGO - General Observation - ROACHES @ MH26.7 ft. AMH - Downstream Manhole, Survey Ends - 18 0092

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    2.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
0MWM
25CM
25.9DAGS
2SSS
0MWL
26MGOROACHES @ MH
2CM
0MGOROACHES @ MH
26.7AMH18 0092
2.6SAP
2.6DAGS
0AMH18 0093
25SSS
2MGOCONN 9 O'CLOCK @ MH/ACTIVE
25.9SAP

Properties (6)

additional_info
SC377681
custom_field_two
3
customer
LACSD
datetime
2019-06-05T00:21:31-07:00
documentation
PROPIPE
is_lateral_inspection
false