Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 7, 2019, 07:03 AM
  • 18 0066_18 0065 _06072019_001335.mp4

Date
06/07/2019
W/O
766605
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00698
PipeID
P13880
Time
12:03 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6561
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
WO_766605_TV18083_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0066
Downstream MH
18 0065
Dir. of Survey
Downstream
Length Surveyed
362.3 ft.
Total Length
362.3 ft.
Structural Index
2
Structural Quick
322M
Structural Rating
150
O&M Index
2
O&M Quick
2400
O&M Rating
8
Overall Index
2
Overall Quick
Overall Rating
158
Pipe schematic from manhole 18 0066 to 18 0065
MH: 18 0066MH: 18 0065downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 18 00660 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 75% MAG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start28.5 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6" - OPEN41.4 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start132.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN213.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"360.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish360.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish360.5 ft. DSC - Deposits Settled Compacted, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish361 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 75% MAG361 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish361 ft. MGO - General Observation - ROACHES @ MH362.3 ft. AMH - Downstream Manhole, Survey Ends - 18 0065

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
360.5DAGS
361SZ75% MAG
360.5SAP
28.5TBOPEN
360.5DSC
213.3TFC
41.4DSC
2SZ75% MAG
0MGOROACHES @ MH
361SSS
0AMH18 0066
3SAP
2.9DAGS
2SSS
132.8TBOPEN
362.3AMH18 0065
0MWM
0MWL
361MGOROACHES @ MH

Properties (6)

additional_info
SC377684
custom_field_two
3
customer
LACSD
datetime
2019-06-07T00:03:22-07:00
documentation
PROPIPE
is_lateral_inspection
false