Wastewater/Activity/PacpInspection/1.0Jun 5, 2019, 05:58 AM
  • 18 0098_18 0097 _06042019_230817.mp4

Date
06/04/2019
W/O
766605
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00698
PipeID
P13918
Time
10:58 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6559
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
WO_766605_TV18083_MAY2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 0098
Downstream MH
18 0097
Dir. of Survey
Downstream
Length Surveyed
107.2 ft.
Total Length
107.2 ft.
Structural Index
2
Structural Quick
4131
Structural Rating
53
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
57
Pipe schematic from manhole 18 0098 to 18 0097
MH: 18 0098MH: 18 0097downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONNECTION IN MH 3 OCLOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 00980 ft. MGO - General Observation - PIPE MATERIAL IS VCP2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start41.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"44.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN91 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Start93.7 ft. MWL - Water Level, 50 %of cross sectional area95.7 ft. FS - Fracture Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES100 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Finish100.8 ft. FM - Fracture Multiple, from 02 to 10 o'clock, within 8 inches of joint: YES105 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish105.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish107 ft. MGO - General Observation - ROACHES @ MH107.2 ft. AMH - Downstream Manhole, Survey Ends - 18 0097

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES

    95.7 ft. - Fracture Spiral, from 12 to 02 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 02 to 10 o'clock, within 8 inches of joint: YES

    100.8 ft. - Fracture Multiple, from 02 to 10 o'clock, within 8 inches of joint: YES

Observations (18)

DistanceCodeObservation
107MGOROACHES @ MH
105.9DAGS
41.1TFA
2.8DAGS
0MWM
100MWLS
93.7MWL
44.2TFOPEN
0MGOCONNECTION IN MH 3 OCLOCK
95.7FS
2SSS
100.8FM
0MWL
105SSS
0AMH18 0098
91MWLS
0MGOPIPE MATERIAL IS VCP
107.2AMH18 0097

Properties (6)

additional_info
SC377681
custom_field_two
3
customer
LACSD
datetime
2019-06-04T22:58:42-07:00
documentation
PROPIPE
is_lateral_inspection
false