Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 31, 2019, 10:19 AM
  • 18 0117_18 0116 _05312019_033255.mp4

Date
05/31/2019
W/O
766605
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00698
PipeID
P13937
Time
3:19 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6556
Sewer Name
18 SANTA FE STREET TRUNK
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
WO_766605_TV18083_MAY2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0117
Downstream MH
18 0116
Dir. of Survey
Downstream
Length Surveyed
356.7 ft.
Total Length
356.7 ft.
Structural Index
3
Structural Quick
3Z2M
Structural Rating
555
O&M Index
2
O&M Quick
2M00
O&M Rating
140
Overall Index
2
Overall Quick
Overall Rating
695
Pipe schematic from manhole 18 0117 to 18 0116
MH: 18 0117MH: 18 0116downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 01170 ft. MGO - General Observation - ROACHES @ MH2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, at 08 o'clock, , within 8 inches of joint: YES, Start3.1 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.7 ft. FS - Fracture Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES, Start37.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start37.7 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish60.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN66.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN109.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN111.3 ft. FL - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES115.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"161.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN167.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"210.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"216.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"262.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6" - OPEN268.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"310.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"317 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"354 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish354 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish355.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish355.2 ft. FS - Fracture Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish355.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, at 08 o'clock, , within 8 inches of joint: YES, Finish356.7 ft. MGO - General Observation - CONNECTION IN MH 9 OCLOCK/CAPPED356.7 ft. AMH - Downstream Manhole, Survey Ends - 18 0116

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, at 08 o'clock,  , within 8 inches of joint: YES, Start

    3.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, at 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    8.7 ft. - Fracture Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    37.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    111.3 ft. - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES

Observations (31)

DistanceCodeObservation
115.3TFC
354CM
111.3FL
355.2FS
310.6TFC
0MWM
167.8TFC
356.7MGOCONNECTION IN MH 9 OCLOCK/CAPPED
317TFC
0MWL
2CM
37.7SAP
0AMH18 0117
0MGOROACHES @ MH
3.1DAGS
355.1SAP
161.6TFOPEN
66.8TFCOPEN
3.1SRI
210.1TFC
268.1TFC
109.4TFOPEN
216.4TFC
355.2DAGS
37.7SRI
60.7TFOPEN
2SSS
262.1TFOPEN
8.7FS
354SSS
356.7AMH18 0116

Properties (6)

additional_info
SC377678
custom_field_two
3
customer
LACSD
datetime
2019-05-31T03:19:23-07:00
documentation
PROPIPE
is_lateral_inspection
false