Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 26, 2019, 09:21 AM
  • 32 1134_32 1133 _26082019_023342.mp4

Date
08/26/2019
W/O
777086
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00842
PipeID
P19585
Time
2:21 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6880
Sewer Name
32 SOLEDAD CANYON TRUNK, SECTION 5
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
11
Purpose
Routine Assessment
Project
RFIR_WO_777086_TV32029_JUL2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1134
Downstream MH
32 1133
Dir. of Survey
Downstream
Length Surveyed
99.1 ft.
Total Length
99.1 ft.
Structural Index
2
Structural Quick
4133
Structural Rating
29
O&M Index
2
O&M Quick
412C
O&M Rating
42
Overall Index
2
Overall Quick
Overall Rating
71
Pipe schematic from manhole 32 1134 to 32 1133
MH: 32 1134MH: 32 1133downstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 11340 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start3 ft. FM - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES45.2 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES54.7 ft. CS - Crack Spiral, from 12 to 03 o'clock, within 8 inches of joint: YES56.7 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES62.7 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES70.7 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start93.5 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish93.5 ft. CM - Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start99.1 ft. CM - Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish99.1 ft. AMH - Downstream Manhole, Survey Ends - 32 113399.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (9)

  • Upstream Manhole, Survey Begins - 32 1134

    0 ft. - Upstream Manhole, Survey Begins - 32 1134

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES

    3 ft. - Fracture Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    45.2 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 12 to 03 o'clock, within 8 inches of joint: YES

    54.7 ft. - Crack Spiral, from 12 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    56.7 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    62.7 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    70.7 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

    93.5 ft. - Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
62.7CL
2DAGS
0AMH32 1134
93.5CL
45.2CL
93.5CM
70.7CL
0MWL
54.7CS
56.7CM
99.1CM
3FM
99.1AMH32 1133
0MWM
99.1DAGS

Properties (6)

additional_info
SC386984
custom_field_two
1
customer
LACSD
datetime
2019-08-26T02:21:21-07:00
documentation
PRO PIPE
is_lateral_inspection
false