18 0885A_18 0885_24072019_003315.mp4
0 ft. - General Observation - CONNECTION AT MH 9 O'CLOCK

0 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2.5 ft. - General Observation - MAG COAT THROUGHOUT
7.6 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
79.8 ft. - Alignment Right, 10 %, Start
126.7 ft. - Alignment Left, 10 %, Start
| Distance | Code | Observation |
|---|---|---|
| 0 | MGO | CONNECTION AT MH 9 O'CLOCK |
| 175 | DAGS | — |
| 173 | SAV | — |
| 173 | LL | — |
| 0 | AMH | 18 0885A |
| 79.8 | LR | — |
| 175 | SSS | — |
| 2.5 | SAV | — |
| 7.6 | SRV | — |
| 0 | SSS | — |
| 2.5 | MGO | MAG COAT THROUGHOUT |
| 173 | SRV | — |
| 126.7 | LR | — |
| 0 | MWL | — |
| 0 | MWM | — |
| 175.8 | AMH | 18 0885 |
| 126.7 | LL | — |
| 2.1 | DAGS | — |