Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 24, 2019, 05:05 AM
  • 32 0150_32 0149_09232019_221849.mp4

Date
09/23/2019
W/O
787630
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00887
PipeID
P19900
Time
10:05 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7009
Sewer Name
32 DISTRICT #32 MAIN TRUNK
City
SANTA CLARITA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
13
Purpose
Routine Assessment
Project
RFIR_WO_787630_TV32048_SEP2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
32 0150
Downstream MH
32 0149
Dir. of Survey
Downstream
Length Surveyed
338 ft.
Total Length
338 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
335
O&M Index
2
O&M Quick
412L
O&M Rating
138
Overall Index
2
Overall Quick
Overall Rating
473
Pipe schematic from manhole 32 0150 to 32 0149
MH: 32 0150MH: 32 0149downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 01502 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start336.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish336.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish336.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish338 ft. MGO - General Observation - COCKROACHES IN MANHOLE338 ft. AMH - Downstream Manhole, Survey Ends - 32 0149

Observation photos (4)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    338 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (11)

DistanceCodeObservation
2SSS
338MGOCOCKROACHES IN MANHOLE
0MWM
338AMH32 0149
336.1SSS
336.1DAGS
0MWL
2SAP
336.1SAP
0AMH32 0150
2DAGS

Properties (6)

additional_info
SC378625
custom_field_two
2
customer
LACSD
datetime
2019-09-23T22:05:09-07:00
documentation
PRO PIPE
is_lateral_inspection
false