Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 27, 2019, 05:15 AM
  • 32 0134_32 0133_09262019_222929.mp4

Date
09/26/2019
W/O
787630
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00887
PipeID
P19882
Time
10:15 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7018
Sewer Name
32 DISTRICT #32 MAIN TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
RFIR_WO_787630_TV32048_SEP2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 0134
Downstream MH
32 0133
Dir. of Survey
Downstream
Length Surveyed
502.9 ft.
Total Length
502.9 ft.
Structural Index
3
Structural Quick
3S2S
Structural Rating
500
O&M Index
2
O&M Quick
2S00
O&M Rating
200
Overall Index
2
Overall Quick
Overall Rating
700
Pipe schematic from manhole 32 0134 to 32 0133
MH: 32 0134MH: 32 0133downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 01342 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start501.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish501.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish501.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish502.9 ft. AMH - Downstream Manhole, Survey Ends - 32 0133

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
2DAGS
501.5SSS
2SAP
501.5SAP
502.9AMH32 0133
501.5DAGS
0MWM
0MWL
2SSS
0AMH32 0134

Properties (6)

additional_info
SC378634
custom_field_two
2
customer
LACSD
datetime
2019-09-26T22:15:03-07:00
documentation
PRO PIPE
is_lateral_inspection
false