Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 20, 2019, 03:16 PM
  • H 0333_H 0332 _20082019_083515.mp4

Date
08/20/2019
W/O
776936
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00175
PipeID
P10783
Time
8:16 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6787
Sewer Name
H JOINT OUTFALL H - UNIT 4
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_776936_TV02325_JUL2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Width
57 in.
Upstream MH
H 0333
Downstream MH
H 0332
Dir. of Survey
Downstream
Length Surveyed
280 ft.
Total Length
280 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole H 0333 to H 0332
MH: H 0333MH: H 0332downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 03330 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area2 ft. VC - Vermin Cockroach2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT THROUGHOUT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start276.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish276.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish280 ft. AMH - Downstream Manhole, Survey Ends - H 0332

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT THROUGHOUT

    2 ft. - General Observation - MAG COAT THROUGHOUT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0AMHH 0333
0MWM
2VC
2SAP
2MGOMAG COAT THROUGHOUT
280AMHH 0332
276.5SSS
0MWL
276.5SAP
2SSS

Properties (6)

additional_info
SC378293
custom_field_two
3
customer
LACSD
datetime
2019-08-20T08:16:49-07:00
documentation
PRO PIPE
is_lateral_inspection
false