Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 20, 2019, 03:36 PM
  • H 0332_H 0331 _20082019_084706.mp4

Date
08/20/2019
W/O
776936
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00175
PipeID
P10782
Time
8:36 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6787
Sewer Name
H JOINT OUTFALL H - UNIT 4
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_776936_TV02325_JUL2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Width
57 in.
Upstream MH
H 0332
Downstream MH
H 0331
Dir. of Survey
Downstream
Length Surveyed
244.1 ft.
Total Length
244.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole H 0332 to H 0331
MH: H 0332MH: H 0331downstream0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 03320 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. VC - Vermin Cockroach2.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.7 ft. MGO - General Observation - MAG COAT THROUGHOUT240.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish244.1 ft. AMH - Downstream Manhole, Survey Ends - H 0331

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT THROUGHOUT

    2.7 ft. - General Observation - MAG COAT THROUGHOUT

Observations (8)

DistanceCodeObservation
2.7MGOMAG COAT THROUGHOUT
240.8SAP
2.6SAP
0MWL
0AMHH 0332
0MWM
244.1AMHH 0331
0VC

Properties (6)

additional_info
SC378293
custom_field_two
3
customer
LACSD
datetime
2019-08-20T08:36:30-07:00
documentation
PRO PIPE
is_lateral_inspection
false