Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 19, 2019, 10:20 PM
  • H 0328_H 0327 _19082019_153453.mp4

Date
08/19/2019
W/O
776936
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00175
PipeID
P10778
Time
3:20 PM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6786
Sewer Name
H JOINT OUTFALL H - UNIT 4
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_776936_TV02325_JUL2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Width
57 in.
Upstream MH
H 0328
Downstream MH
H 0327
Dir. of Survey
Downstream
Length Surveyed
24.3 ft.
Total Length
24.3 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole H 0328 to H 0327
MH: H 0328MH: H 0327downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 03280 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. VC - Vermin Cockroach3.9 ft. MGO - General Observation - MAG COAT THROUGHOUT3.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start24.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish24.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish24.3 ft. AMH - Downstream Manhole, Survey Ends - H 0327

Observation photos (3)

  • General Observation - MAG COAT THROUGHOUT

    3.9 ft. - General Observation - MAG COAT THROUGHOUT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
3.9MGOMAG COAT THROUGHOUT
0AMHH 0328
0MWM
3.9SAP
24.3SSS
24.3SAP
0MWL
3.9SSS
0VC
24.3AMHH 0327

Properties (6)

additional_info
SC378292
custom_field_two
3
customer
LACSD
datetime
2019-08-19T15:20:41-07:00
documentation
PRO PIPE
is_lateral_inspection
false